What are the processes for customized water cooling plates?
The specific process is as follows:
Step 1: Communicate and clarify your needs.
Upon receiving customer tasks, the R & D design team will fully communicate with customers, understand the product heating core specifications, heat dissipation power, working environment and other detailed data, and give the most cost-effective solution combined with customer needs.
Step 2: Design, simulation.
According to customer needs, the R & D team designed a water-cooled plate and determined the details with customers. Engineers on the product (mainly cold head) structure design simulation, thermal simulation to confirm the product material, surface treatment and manufacturing process, to ensure the product installation, maintenance, versatility and environmental protection requirements, and develop the relevant inspection standards and specifications.
Step 3: proofing, production testing.
After water-cooled plate design is passed, the sample production is made. Overall plan, enter the test. Test process in close communication with the customer, according to the actual situation, to adjust and modify until the customer's requirements.
Step 4: Installation, acceptance.
After the test is passed, it is delivered to the customer, and our technicians will coordinate the installation and debugging. Customer acceptance.
Step 5: After-sales service.
Provide technical guidance and maintenance. Establish customer database, deal with all kinds of sudden problems in time, and relieve customers' worries.
评论
发表评论